Hi Matt,
The right way is to assign equipment/instrument on operation level to characteistic in Plan.
If you do so, same equipment can be seen directly in QE01 during result recording.
regards/rohit
Hi Matt,
The right way is to assign equipment/instrument on operation level to characteistic in Plan.
If you do so, same equipment can be seen directly in QE01 during result recording.
regards/rohit