Order triggered on Completion

$
0
0

Hello All,

 

I need an order to be generated with 90 days period to complete it (Basic Start & Basic Finish Dates). I want the next order to be triggered only after the previous order is completed. The next order should start from the next day the previous order was completed and it should have 90 days to complete it.

 

I had posted a simillar requirement in the past but that did not satisfy. The reason being, the Basic Finish date for the second order is based on the second call that is on the 180th day and if the order was completed before the 90 th day or after the 90 th day the Basic Finish day will not float. I am not sure if we have to use a strategy based plan for my requirement.My data included a task list with 90 Day package and a strategy based plan.

 

Please advice.

 

Thanks & Regards

Sid

 

https://scn.sap.com/thread/3471319


Viewing all articles
Browse latest Browse all 9159

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>