Hi Mani,
Thanks for the information. Our need is to perform capacity leveling on subcontractor's resources used for production. However from your link SAP help says the capacity leveling is not possible. Here is the extract of the help:
In SNP, the heuristic-based and optimization-based planning approaches are available for the subcontracting process. The planning procedures deployment, transport load
building (TLB), and capacity leveling are not possible
Here it's nowhere tell about capacity leveling. I appreciate if you can please clarify this.
Thanks
Raj