Hi Munabhai,
The possible reasons are
1. Check the material master which division you have maintained. For this division with the combination of plant whether BA assignment has deleted or not in OMJ7.
2. Check the assignment of cost element in OKB9. Whether the cost centre of the BA has assigned it.
Regards.
Mukthar