Hi Ethan,
You can add a type 10 inspection for the material(s), and set up QM/SD info records to prevent the post goods issue from occurring without a completed inspection lot. Info records for other customers can be set to suppress creation of an inspection lot altogether, or allow PGI without UD as needed.
Regards,
John