HI ,
To create Feasible Production plan in APO , you have to consider the Alternative PPMs during production planning Run
Alternatives PPMs it means Extra available capacity
How I let the system see this available capacity ?? and how I can utilize the alternatives PPMs ??
I know the Heuristic SAP_REM_02 has a lot or restriction and I try with it and not working , is there any heuristic can do this or I should work the PP/DS optimizer , if optimizer what setting should I have it to achieve my requirement ?
Regards
Rami