Hi Hiren,
In the attached screen shot the material inspection plan has two task list with same usage i.e. 5 so, system doesn't know which inspection plan have to be assigned to particular inspection lot. Please check the status of inspection lot in CRTD. If CRTD is their go to transaction QA02 and assign tasklist manually then system will allow you to enter results.
Regards,
Kumar R