Hi,
Do we need to have a 0130 inspection type in a production order for an external operation if we already have inspection characterisitics to this operation work center (and a control key which is inspection relevant and is marked as external processed) ? Cant we just have the 03 assigned to the material and track all production order inspection (inhouse as well as subcontracting) in a single 03 inspection lot rather than having a 03 and a 0130 inspection lot for the production order.
Thanks