Dear Experts
I'd like some suggestion on processes of filling up setup table and initial load data into SAP BI.
- In case, in SAP R/3 has some sales documents from 10 years until current. If I'd like to initial load ONLY the last 3 year data until current into SAP BI, should the setup table be fill with those last 3 years data?
- In t-code = SBIW (fill setup table, SD-Sales Order), there was no criteria to specify period. How could the ONLY last 3 years data could be filled in the setup table?
- If there are only few sales order documents were chosen to fill in the setup table, the rest of data (last 3 years) which were not selected could be automatically extracted into SAP BI (selection criteria (date) which was specified in SAP BI instead)?
- If the schedule the V3 job is not set, what will happen?
- How come there is no variant for setting during scheduling the V3 job?
Any suggestions would be appreciated.
Thank you very much.