Hi Ajay,
You have mentioned to check the SPL in plant B for the material this has the following setting:
procurement type = F
SPK=70
when I check the SPK 70 in OMD9 for plant B:
Procurement type=E
Special Procurement type= E
Plant = Blank
then in section "As BOM component:
tick in the option "withdr.altern.plant -----issuing plant = plant A
Are the above settings correct? because when I run CK11n I still get the same error messages.
thanks
Joe