Hi,
Didn't get the entire problem. Understand in PO there was no scheduling margin key as it was not maintained in material master. But it should be schd margin key 000 as the field is mandatory in material master.
What is the scheduling type? If it is backward scheduling, then it is SAP standard behaviour.
Regards,
Krishnendu.