Hi Experts,
Looking for standard procedure of changing the number range interval of Shipment document. The number range is about to expire.
1. Only Standard Intervals present and only "01" used.
2. Sandbox, Dev, Testing and regression systems having different NR status.
3. Do i need to transport maintaining or changing 01. In that case what happens to NR status(current number) field in target system.
4. Or directly opening up Prod system on a off time and changing is better way?
Regards,
Sudhakar